Detailed Narrative Description of the Project:
Heavy traffic of Peshawar has created miserable stress and wastage of time, while passing through different places. The project is designed to increase the width of road so that it can absorb the existing and future traffic flow. The work is in progress as the design is finalizing.
Project Details
|
|