56 logo
Check Email Pakistan-Flag-icon HQ FWO United-Arab-Emirates-icon UAE FWO

Completed Projects

 
makeen city map
 
 
Detailed Narrative Description of the Project 
 
This project aims at development of the Makeen City by constructing internal infrastructure and road network.
 
 
Project Details

 Project Name:  Makeen City Roads
 Project Location within  Country: NWA (FATA)
 Name of Client / Sponsor: TDP (FATA Sectt)
 Consultant:  NESPAK
 No of Plants Employed: 2 Nos
 Start Date (Month / Year): Aug 2016
     
 Country:  Pakistan
 Scope of Work:
2.7 Km Road
 No of Person  Employed:  5
 Name of Associated  Firm (s) Nil
 Total Project Cost:  Rs 186 Mn
 Completion Date
Sep 2017
 
 
  • makeen-city-1
  • makeen-city-2
  • makeen-city-3
  • makeen-city-4
  • makeen-city-5
pash ziarat
 
 
Detailed Narrative Description of the Project 
 
This project aims at development of Razmak Pash Ziarat by constructing road network with in FATA region.
 
 
Project Details

 Project Name:  Razmak Pash Ziarat Roads
 Project Location within  Country: NWA (FATA)
 Name of Client / Sponsor: TDP (FATA Sectt)
 Consultant:  NESPAK
 No of Plants Employed: 70
 Start Date (Month / Year): Aug 2016
     
 Country:  Pakistan
 Scope of Work:

Road Length     -           23 Km
Culverts         -           58 Nos
R/B Wall        -           12.5 Km

 No of Person  Employed:  7
 Name of Associated  Firm (s) Nil
 Total Project Cost:  Rs 866 Mn
 Completion Date
Jul 2018
 
 
  • Slide17
  • Slide18
  • Slide19
  • razmak-pash-ziarat-1
  • razmak-pash-ziarat-2
  • razmak-pash-ziarat-3
  • razmak-pash-ziarat-4
  • razmak-pash-ziarat-5
  • razmak-pash-ziarat-6
  • razmak-pash-ziarat-7
  • razmak-pash-ziarat-8
lyari
 

1. 39 Km road consisting of two bounds on both sides of Lyari Nulla will stretch from Maripur to Sohrab Goth.
2. The road reduces the distance/travelling time from one end to other end.
3. Respect for the local community and environment are among the top concerns on the Lyari Expressway. 
4. Project inaugurated by P.M of Pakistan on 28th Jan 2018 as major works have been completed less service road (27 Km at both bounds).
5. Project remained delayed due to non availability of execution site since 2002.

 
 
Project Details

 Project Name:   Lyari Expressway Project
 Project Location within  Country: Karachi
 Name of Client / Sponsor: NHA
 Consultant:  Engineering Associate
 No of Plants Employed: 139
 Start Date (Month / Year): May 2002
     
 Country:  Pakistan
 Scope of Work:
38.79 Km Road Works,
30x Birdges
12 Km 2x
Elev Str 3.622 Km
 No of Person  Employed:  537
 Name of Associated  Firm (s) Nil
 Total Project Cost:  Rs 9940.66 Mn
 Completion Date
Dec 2004   EOT Date:   Dec 2017
 
 
  • l5
  • l6
  • lyari-expressway-2
  • lyari-expressway-3
  • lyari-expressway-4
  • lyari-expressway
wana bypass map
 
 
Detailed Narrative Description of the Project 
 
This project aims development of Wana by providing Bypass and in order to avoid inconvenience for local i.e checking at check ports and to secure military installation i.e Javed Sultan camp, south Waziristan scouts & Farhad camp etc.
 
 
Project Details

 Project Name:  Wana Bypass Road
 Project Location within  Country: NWA (FATA)
 Name of Client / Sponsor: TDP (FATA Sectt)
 Consultant:  MCE
 No of Plants Employed: 20 Nos
 Start Date (Month / Year): Mar 2017
     
 Country:  Pakistan
 Scope of Work:
8.7 Km Road
 No of Person  Employed:  118
 Name of Associated  Firm (s) Nil
 Total Project Cost:  Rs 288 Mn
 Completion Date
Dec 2017
 
 
  • wana-bypass-1
  • wana-bypass-2
  • wana-bypass-3
  • wana-bypass-4
  • wana-bypass-5
  • wana-bypass-6
Makeen
 
  • Increase accessibility to remote areas of SWA / NWA through const and improvement of existing roads.
  • Generate economic opportunities for the tribesmen through improved market access. The economic activities may include transportation of the  agriculture products and goods 
  • Improved linkage of SWA / NWA to the provincial and national highways 
  • Better connectivity between major cities of settled areas and SWA / NWA.
 
 
Project Details

 Project Name:   Makeen - Razmak - Miran shah Rd
 Project Location within  Country: FATA (KPK)
 Name of Client / Sponsor: UPAP
 Consultant:  NESPAK
 No of Plants Employed: 218
 Start Date (Month / Year): June 2012
     
 Country:  Pakistan
 Scope of Work: Length - 73 Km Construction of Road / Causeway / Culverts / Bridges
   
 Name of Associated  Firm (s) Nil
 Total Project Cost:  Rs 5433
 Completion Date
Aug 2016
 
 
  • 102
  • 103
  • 111
  • Makeen-Razmak-Miran
  • Makeen-Razmak-Miran1
  • makeen
  • makeen2