Detailed Narrative Description of the Project:

Jaglot – Skardu is a major link between KKH and Skardu.FWO has the privilege of its initial track construction which was completed in 1984. Length of road is 164 Km having 3.66 Meter width of black top. The difficult terrain has intense snow fall and major rock sliding. Now, the upgradation of Jaglot - Skardu, road will enhance the comfortable road ride to locals as well as tourist by increasing the width of road from 3.6 to 7.3 meter and reducing the sharp curves. Rd width of 43 Km has been complete and structures have started almost throughout the road. The project is likely to be completed before stipulated time (Jul 20).

Project Details

 Project Name: 

Up-Gradation, Improvement ,Widening & Construction of Jaglot-Skardu Road Project (164 Km)

 Project Location within  Country: Skardo
 Name of Client / Sponsor: PSDP
 Consultant: 
 FWO(FINIT,CPM)
 No of Plants Employed:  416
 Start Date (Month / Year): Aug 2017
     
 Country:  Pakistan
 Scope of Work: Construction of Road, Retaining & Breast Wall, Culvert & Bridges
 No of Person Employed:  1646
 Name of Associated  Firm (s) Nil
 Total Project Cost:  Rs 31000 Mn
 Completion Date
Jul 2020
 
 
  • Jaglot-Skardu-1
  • Jaglot-Skardu-2
  • Jaglot-Skardu-3
  • Jaglot-Skardu-4
  • Jaglot-Skardu-5
  • Jaglot-Skardu-6
  • Jaglot-Skardu-7
  • Jaglot-Skardu-8
  • Jaglot-Skardu-9
  • Slide20
  • Slide22
  • Slide23
  • Slide24
  • Slide26
  • Slide29