
FWO designed and built a fully galvanized, 330-meter long steel and multi slab concrete bridge, engineered for durability against future climatic challenges. Completed in an impressive 11 months with financial support from the United Arab Emirates (UAE), the bridge restored a critical link in the region’s transportation and supply network
Aenean sed adipiscing diam donec adipiscing tristique risus. Nunc pulvinar sapien et ligula ullamcorper malesuada. Venenatis urna cursus eget nunc scelerisque viverra mauris in. A cras semper auctor neque vitae tempus.
location
Barikot, Malakand
sector
Communication Infrastructure
Length
330 Meter
completion
May 2014
Error: Contact form not found.
Copyright © 2026 FWO All Rights Reserved.