
The Southern Loop of the Lahore Ring Road, a 22.4-kilometre signal free corridor, has significantly enhanced urban mobility. By seamlessly connecting major residential areas, including Bahria Town and NFC-2, to Allama Iqbal International Airport, it provides direct, uninterrupted access from the N-5 National Highway to both the airport and the Lahore – Sialkot Motorway. This strategic artery improves traffic flow, reduces congestion and strengthens overall connectivity across the city
Aenean sed adipiscing diam donec adipiscing tristique risus. Nunc pulvinar sapien et ligula ullamcorper malesuada. Venenatis urna cursus eget nunc scelerisque viverra mauris in. A cras semper auctor neque vitae tempus.
location
Lahore
sector
Communication Infrastructure
Length
22.4 KM
completion
May 2024
Error: Contact form not found.
Copyright © 2026 FWO All Rights Reserved.