Rathoa Haryam Bridge
FWO designed and built a fully galvanized, 330-metre long steel and multi slab concrete bridge, engineered for durability against future climatic challenges.
Read MoreKurram Tangi Dam
The Kurram Tangi Dam, constructed across the Kaitu River in North Waziristan, is designed to generate 18.9 Megawatts
Read MoreDadhocha Dam Project
Among the organization’s large repertoire of current works stands out the 60,000 acre-feet earth-filled Dadhocha Dam, projected to be finished by December 2027
Read MorePakistan Expressway (N-25)
The organization has initiated the rehabilitation of existing dualized and dualization of the 172-kilometre stretch from Mustang to Chaman
Read MoreWhite Oil Pipeline
The 477-kilometer Faisalabad – Thallian – Taru Jabba White Oil Pipeline, extending from the PARCO Machike Terminal to Tarujabba via Thallian
Read MoreEL 207 – Mining
The Thar Coal Rail Connectivity Project features a 107-kilometer single-track railway line designed to link the Thar Coal
Read MoreEL 320 – Mining
The Thar Coal Rail Connectivity Project features a 107-kilometer single-track railway line designed to link the Thar Coal
Read MorePTC Electric Bus Depot
The Punjab Transport Company (PTC) is developing electric bus infrastructure in Punjab, with FWO
Read MoreGPO Chowk Underpass
The GPO Chowk Underpass in Rawalpindi is a newly commissioned underpass on Mall Road
Read MoreGwadar – Ratodero Road (M-8)
Commissioned in 2025, is a strategically pivotal transport corridor that enhances trade, mobility and regional connectivity between Balochistan and Sindh
Read More









