
Thar Rail Connectivity; Pakistan’s 1st Green Field Railway Project features a 107-kilometre single railway track which will integrate Thar Coal mines with the strategic rail infrastructure, enabling smooth and efficient transportation of indigenous Thar Lignite Fuel across the country Â
Aenean sed adipiscing diam donec adipiscing tristique risus. Nunc pulvinar sapien et ligula ullamcorper malesuada. Venenatis urna cursus eget nunc scelerisque viverra mauris in. A cras semper auctor neque vitae tempus.
location
Thar Coal Block || Mines
sector
Railway
Length
107 KM
completion
Jul 2026
Copyright © 2026 FWO All Rights Reserved.